Unfortunately due to a misunderstanding with the swing company we have had to dig out our prepared swing area. Local man Dan shifted the stones for us to add a huge amount of topsoil (27 bags!!!!!!) to prepare for turf. This has set us back in terms of time and money, but thanks to Jim Towers, chief raker and leveller, we now have a surface ready for turfing.
Finally after much raking, laying, levelling, watering, a broken down delivery truck, all the stops were pulled out and the swings were up and ready for the grand opening!!
Create Your Own Website With Webador